Water Treatment Works
Client: C2V+
Project: Water Treatment Centre
Location: Dearham – Cumbria
Information:The construction of a storage tank to hold any excess flow of sewage. 3500m3 of concrete was used on the project. The location of this job created some logistical issues. The site had very limited space for trucks, the road to the site was very narrow with a steep hill so we had to avoid trucks meeting on the road as well as controlling the timings of trucks arriving and leaving the site. After discussions with the client, we worked together to ensure that the pours continued at a suitable rate without causing any congestion.